1InstallationandOperationInstructionsJøtul GF 400 DVSebagoGas HeaterIF THE INFORMATION IN THESE INSTRUCTIONSARE NOT FOLLOWED EXACTLY, A FIRE OR EXPLO-
10HORIZONTAL RUN35 Ft.(10.67 m)30 Ft.(9.14 m)25 Ft.(7.62 m)20 Ft.(6.10 m)15 Ft.(4.57 m)5 Ft.(1.52 m)10 Ft.(3.05 m)5 Ft.(1.52 m)VERTICAL RUN15 Ft.(4.57
11HORIZONTAL RUN35 Ft.(10.67 m)30 Ft.(9.14 m)25 Ft.(7.62 m)20 Ft.(6.10 m)15 Ft.(4.57 m)5 Ft.(1.52 m) Min. Rise2 Ft.(.60 m)10 Ft.(3.05 m)5 Ft.(1.52 m)V
12Co-linear Vent InstallationThe GF 400 DV Sebago may be vented through a ma-sonry or Class A prefabricated chimney using a Co-linearFlexible Vent sys
13Masonry or Prefabricated ChimneyConversionThe GF 400 DV Sebago is approved for use with listedchimney conversion kits from any of the manufacturers
14Horizontal Termination Any horizontal termination must fall within theshaded portion of the vent window graph illustratedin figs. 9 or 11. For Sno
15Figure 19. Vent Terminal Clearances - National Fuel Gas Code.Horizontal Termination ClearanceFigure 20. Termination Clearance to overhangs376 mm12
16Tools required:• 1/2” open ended wrench or deep-well socket, Torx T20or slotted screwdriver, 4 mm allen wrench.Conversion Kit Contents:• 1, regulato
17CloseOpenFuel Conversion ProcedureRefer to fig. 47, Illustrated Parts Breakdown, to identifypart numbers below.1. Turn off gas supply to stove.2. Re
18Gas Supply ConnectionConnect the gas supply line to the stove, beforeinstalling the optional Blower.If the blower will be installed, use a 45° elbow
19Gas PressureCorrect gas pressure is essential for efficient and safeoperation of the GF 400 DV Sebago gas stove. It isimportant that the correct pr
2Welcome to Jøtul...Congratulations on the purchase of your newJøtul GF 400 DV Sebago Gas Heater.We at Jøtul are glad you’ve made the decision towarm
20CloseOpenOptional Wall Thermostat orRemote ControlUse only a 750 millivolt DC two-wire circuit thermostatwith this appliance. The thermostat should
21Log Set InstallationNOTE: If appropriate, install the optional Antique BrickPanel Kit before assembling the logset.The GF 400 DV Sebago logset must
22System Check1. PURGING THE GAS LINE: When lighting the appli-ance for the first time, it will take a few moments toclear the gas line of air. Once
23OperationFamiliarize yourself with the controls of the GF 400 DVSebago. Make sure that anyone else using the applianceis also familiar with the cont
24Glass CareClean the glass only when necessary. Wipe the surfacewith a clean, dampened, soft cloth. Follow with a dry,soft towel. Take care not to sc
25Optional Blower # 156000Figure 43. Attach Snapstat and Blower Brackets. THIS BLOWER MUST BE ELECTRICALLYGROUNDED IN ACCORDANCE WITHLOCAL CODES
26Blower OperationThe optional variable-speed blower will enhance heatcirculation around the firebox and out into the room.The blower is controlled by
271. Remove the Top Plate. Simply lift if up off of thestove body. It is not fastened.2. Remove the Glass Frame. Disengage the twocompression latche
28 Figure 51. Illustrated Parts Breakdown - GF400 DV SebagoGF 400 DV SebagoIllustrated PartsBreakdown1413124746111098765432145 4443424140393837363534
291. Air Divider ... 2206242. Simpson DuraVent Collar ...
3Table of ContentsService Tools ... 3Specifications ... 4General In
30MODEL NAME: ________________________SERIAL NUMBER: ______________________DATE OF PURCHASE: ___________________PURCHASED FROM: ____________________NA
313. Access the lower controls.4. Depress gas control knob slightly and turn clock-wise to “OFF”. Do not force.FOR YOUR SAFETY, READ BEF
32Jøtul ASP.O. Box 1411N-1602 FredrikstadNorwayJøtul North America55 Hutcherson Dr.Gorham, ME 04038-2634November 2005137750-EThis appliance must be in
4SpecificationsGF 400 DV SebagoSpecificationsInput RatesNatural Gas32,000 BTU/hr. maximum input 18,000 BTU/hr. minimum inputPropane 32,000 BTU/hr. max
5Hardware Bag Contents• Fuel Conversion Kit - LP... 155351• Ember Bag , 4 oz. ...
6LocationIn selecting a location for the stove, consider thefollowing points:1) Heat distribution2) Vent termination requirements3) Gas supply line
7Stove and Vent ClearanceRequirementsMinimum Clearances from the Stoveto Combustibles: See figs. 2-4.Rear: 2” (51 mm)Ceiling: 32 1/4” (819 mm)Corn
8Vent RestrictionThe GF 400 DV Sebago is equipped with Restrictor Plateswhich enable you to regulate the flow of incomingcombustion air and exhaust ga
9Vertical Vent TerminationThe Jøtul GF 400 DV Sebago can be vertically ventedthrough a ceiling or to a roof termination with thefollowing guidelines:
Kommentare zu diesen Handbüchern